IStructE Jan 2026 solution Question 2

Multi-Storey Office Conversion with RC Moment Frame and Steel Braced Frame Schemes

Solution Overview

This solution details the renovation of a damaged 10-storey building into office space. It presents two distinct structural schemes: an unbraced RC moment frame with two-way slabs and a steel frame utilizing diagonal cross-bracing and composite Bondeck slabs.

Key challenges addressed include achieving a 2.8m clear height, avoiding additional internal columns, and managing lateral stability via diaphragm action and external feature bracing. Technical content includes load run-downs, double-reinforced RC beam design for 20m spans, and preliminary sizing for steel plate girders. Deliverables comprise functional framing plans, vertical and lateral load path diagrams, and foundation adequacy justifications based on existing capacity.

Review your solution
Get Feedback on Your Solution.Learn where your solution falls short, what could be improved, and how others approached the same problem.

Comments0

Join the discussion and share your thoughts on this solution.

Login or signup to post your own comments.

Loading discussion...